Bridge Lifts Procedure/Policy

There are five (5) lift span bridges, for which Council has the responsibility of lifting on behalf of the RTA, to cater for river traffic, along the Murray River that are located within the Wakool Shire.

RTA is responsible for maintenance, repairs and replacement of these bridges - they own them.

Obviously Council has had to put in place a Bridge Lifting Procedure, not only to organise man power for traffic control but also to notify the various emergency services etc.

A copy of the procedure is attached for viewing in the downloadable document box below.

For people wanting a bridge lifted, a minimum of 48 hours notice is required. Please contact the Moulamein Office to advise the details.

For further details please contact Councils Engineering Department at the Moulamein Office on 03 58875007 or complete & submit the online request form below.

Contact Details

  • Wakool Shire Council - Engineering Services
  • Phone: 03 58875007
  • Fax: 03 58875103
  • mail@wakool.nsw.gov.au

Downloads

Bridge Lifting Procedure (PDF 107KB)